Notes on the Merthyr Tydfil Tramroads – part 2

by Gwilym and John Griffiths

Cwm Cannaid Tramroad: We do not know when this tramroad was constructed. We would guess it was sometime around 1800-1814. Despite its name, the tramroad was built before the shaft of Cwm Cannaid Colliery was sunk. The track was shown clearly on the 1814 Ordnance Survey Map and on Robert Dawson’s 1832 Boundary Commission Map whereas the shafts of Cwm Cannaid Colliery were apparently sunk about 1845. The purpose of the tramroad was to relieve the inefficient old tub canal, or coal canal, sometimes called the Cyfarthfa Coal Canal, of the 1770s. The latter transported coal (and perhaps ironstone?) in two-ton tubs from levels (some suggested via dangerous leats) in Cwm Cannaid to Cyfarthfa Works: some say horse-drawn, others say hauled or pushed by men and women. The Cyfarthfa Coal Canal was closed around 1835, which gives an explanation of Cwm Cannaid Tramroad on Robert Dawson’s 1832 Boundary Commission Map.

The tramroad followed roughly the route of the old coal canal: the latter a twisting route, the former almost a straight line. It skirted Glyn Dyrys Ironstone Mine, a coal shaft below Lower Colliers Row, in front of Lower Colliers Row itself, Tir Wern Uchaf (where it crossed the canal twice), a link to Cwm y Glo Colliery and Ironstone Mine, Upper Colliers Row, Tir Heol Gerrig and hence to the coke ovens and yards above (to the west) of Cyfarthfa Works.

Lower Colliers Row. Photo courtesy of the Alan George Archive

When Cwm Cannaid Pit was sunk in 1845, that became the terminus of the system. The 1901 Ordnance Survey Map named it ‘Cwm Pit Railway’, and the line linking it to ‘Gethin Railway’ was labelled ‘railway in course of construction’. We saw the remnants of these mines, canal and tramroad in the 1940s and 1950s, and often walked the old canal embankment, by then well wooded.

A section of the 1901 Ordnance Survey Map showing the tramroad marked as ‘Cwm Pit Railway’. Lower Colliers Row and the old Cyfarthfa Canal are also shown.

Again, industrial despoliation was reverting to nature: delicious wild strawberries on the old waste tipping, a nightingale singing by the disused and reed-covered canal reservoir, woodcock and common snipe, pied flycatchers and wood warblers, and numerous other birds; with wild orchids amongst the damp marshy vegetation with dragon-flies, damsel-flies, glow-worms and water-boatmen. We doubt if this still exists in the coniferous plantations which replaced them all in more recent years.

Dowlais Tramroad: This was constructed about 1792-93 to connect Dowlais Works with Pont y Storehouse near the Glamorgan Canal terminus, roughly near present-day Jackson’s Bridge. It gave Dowlais Works access to the then ‘recently’ constructed Glamorgan Canal. The route may well have followed initially the Morlais Quarry Tramroad from Dowlais via Gelli Faelog, keeping to the Gelli Faelog side of Nant Morlais. The 1793 extension from this tramroad is today represented by the main road and high pavement from Trevithick Street down to Pont Morlais and thence via the tunnel, formerly a bridge, into Bethesda Street to Jackson’s Bridge. Did the Glamorgan Canal Company pay the £1,100 for the construction of the tramroad (and Jackson’s Bridge) in lieu of the proposed linking canal from Merthyr Tudful to Dowlais?

Bethesda Street in the 1950s. The car is parked on what was the where tramway exited the tunnel mentioned above and continued to the Glamorganshire Canal at Pontstorehouse. Photo courtesy of the Alan George Archive

Gethin Tramroad: This tramroad or railway linked Gethin Colliery (sunk between 1845 and 1849 and opened 1849) initially, and Castle Colliery later (1860s?), with Cyfarthfa Works, taking a route in between those of Cwm Cannaid Tramroad and Ynys Fach Tramroad. No tramroad was shown on the 1850 Tithe Map and Schedule. By 1886 the track left Castle Colliery, skirted the hillside west of the Glamorgan Canal between Furnace Row and Tir Pen Rhiw’r Onnen, through Gethin Colliery (with a link to pit-shaft No2), past Graig Cottage and a bridge over Nant Cannaid. At (the 1853) Cyfarthfa Crossing it curved northwestwards past Tir Wern Isaf and Tir Llwyn Celyn, looping under the 1868 Brecon and Merthyr Railway near Heol Gerrig, and thence to the coke yards.

Gethin Colliery. Photo courtesy of the Alan George Archive.

By 1886 the route was upgraded to the GWR and Rhymney Railway as far as the Cyfarthfa Crossing. The 1876 six-inch Ordnance Survey Map showed the terminus for the ‘cwbs’ at the rear of Cyfarthfa Works. The 1901 Ordnance Survey Map called it ‘Gethin Railway’. Our grandfather used the railway to get to work at Castle Colliery, and we regularly used this route (then upgraded to a full railway) in the 1940s and 1950s on our daily journeys to and from school at Quakers Yard. One of us was on the last train to use this line before the viaduct between Quakers yard and Pont y Gwaith was found to be unsafe.

Gyrnos Quarry Tramroad: This was used to bring limestone from Gyrnos Quarry (Graig y Gyrnos) alongside Tâf Fechan, past the limekilns and coal yards, over Afon Tâf by Pont Cafnau to Cyfarthfa Works. We have no details of dates, but walked the route many times in the 1950s in search of dippers, kingfishers, grey wagtails and the rest. It was the first tramroad recorded in the 1805 list of John Jones and William Llywelyn: 1 mile 106 yards to Cyfarthfa Furnaces and just over 1¾ miles to the new Ynys Fach Furnaces. In view of the size of the quarry, it must have transported many tons of material.

Pont-y-Cafnau in March 2017

Merthyr’s Trams

78 years ago today saw the last tram journey run in Merthyr. To mark the occasion, local historian Keith Lewis-Jones has provided the following fascinating article.

Trams at Pontmorlais Circus

The first thoughts of a tram system in the Merthyr area were in 1878, when a scheme was proposed by Messrs. Taylor, Forester and Sutherland, to construct a horse or steam tramway between Merthyr and Dowlais. In 1879, a public meeting was held at the Bush Hotel in Dowlais for the three promoters to explain their plans and to canvass support for the proposed system. The tramway failed to materialise for a variety of reasons, both financial and fear that the toll on the horses hauling trams up gradients, as steep as one in eleven, would make the tramway unprofitable to work.

By 1890, the population of Merthyr was 60,000, and the service of horse cars and brakes was wholly inadequate for the transport needs of such a large population. By this time a large section of the working population was employed at the Dowlais Works, with many living along the Brecon Road corridor and in Cefn Coed

It was therefore proposed to lease out, to a private company, the right to construct Light Railways between Cefn Coed and Dowlais, with a branch running to the centre of Merthyr at Graham Street. As is always the case with such progressive ideas, a great deal of vigorous and influential opposition was forthcoming from vested interests. It was decided to set up a commission to hear evidence and propose a way forward.

In May 1898 the Merthyr Tydfil Electric Traction and Lighting Co. Ltd., a wholly owned subsidiary of British Electric Traction (BET), made an application for a Light Railway Order under the Light Railways Act of 1896, and the order was granted on 16 May 1899.

The Light Railway Order authorised the construction of three railways.

Railway no. 1 was to be 3 miles 1 furlong 2.8 chains long and was to run from opposite the Morning Sun public house in Cefn High Street via Cefn Bridge, Brecon Road, Pontmorlais Road West, Penydarren Road, High Street Penydarren, New Road & High Street Dowlais to a terminus opposite the Bush Inn.

The section from the Morning Sun to the Merthyr side of Cefn Bridge was not to be constructed until Cefn Bridge had been re-constructed or replaced.

Railway no. 2, 3 furlongs 3.5 chains in length, was to run from the north side of the Owain Glyndwr on Pontmorlais Road West to Graham Street via High Street, terminating at the west end of Graham Street.

Railway no. 3 was 1.7 chains in length and formed the third side of the triangle at Pontmorlais, joining railway no. 1 with railway no. 2 on the east side of the Owain Glyndwr.

Trams at the terminus in Graham Street

The Tram Depot, known as the Traction Yard, was constructed on the site of Penydarren Ironworks and was reached by way of a branch line which left the Dowlais route at the Trevethick (sic.) Street Junction. As well as providing facilities for tram maintenance, the site also housed the generating station for 550 volts direct current. As can be seen in the Company’s name, not only was it set up to operate trams but also to provide lighting within the area.

Traction Yard

For the opening of the system, thirteen single deck and three double deck trams were obtained. The single-deckers, nos. 1-13, were built by the Midland Railway Carriage & Wagon Co. Ltd., of Shrewsbury. They seated twenty-six passengers.

The open top, double deck trams came from the Electric Railway & Tramway Carriage Works Ltd. (ERTCW), of Preston – part of Dick, Kerr & Co. Ltd. They were numbered 14-16 and seated forty-eight passengers.

The first passengers were carried 6 April, 1901 with Dowlais route trams displaying a triangle and Cefn route vehicles a square on the front. The trams ran between 5.15 a.m. and 10.15 p.m. Passengers fares were one penny per mile or part thereof. Some examples being – Merthyr to Dowlais 2d and Cyfarthfa to Merthyr 1d. The fare for a journey from the Morning Sun in Cefn to the Bush Hotel in Dowlais would be 4d.

A tram outside the Bush Hotel in Dowlais

1903 saw the only serious accident to affect the tramway. On 22 January car number 10 left the rails while descending New Road, Dowlais causing no serious injuries, but the tram was badly damaged.

Passenger numbers had declined to 2,086,684 by 1936. The 1930’s had seen a decline in the number of passengers carried, partially due to the high rate of unemployment in the Borough – 41.7% in 1936.

The Corporation had been prevented from competing with the trams under the provisions of the Merthyr Tydfil Corporation Act of 1920 and so the tramway was eventually purchased by the Corporation for £13,500 in 1939, and abandoned on 23 August, leaving the Company to continue electricity generation until 1948.

Merthyr’s Last Tram

During its life, the tramway carried an estimated 85 million passengers and the tramcars covered a distance of around 8 million miles. Apart from the system in Cardiff, Merthyr’s tramway was the longest lasting in South Wales.

A fuller account of Merthyr’s Tram system by Keith Lewis-Jones can be found in Merthyr Historian volume 20.