Merthyr’s Chapels: Zoar Chapel

Zoar Welsh Independent Chapel

In 1794 a group of worshippers dissatisfied with the form of worship at Ynysgau Chapel left to start their own cause, and met in the Long Room of the Crown Inn; paying £6 a year for the hire of the room. In 1797 the congregation asked Mr Howell Powell of Newport to come and minister to them, and within a year they decided to build their own chapel.

An extensive piece of land was acquired to build a new chapel and the building began in 1798. The land that was acquired stretched from the main road to the Morlais Brook, and was leased for the sum of 12 guineas per annum, but the congregation could not pay that sum of money. Consequently, Mr Henry Thomas or Harri’r Blawd as he was frequently called, took the lease from them and gave them the land on which the present chapel is now built for a rent of £3.7s.

Despite this, the congregation still struggled to find the money to build the chapel, but thanks to a number of donations, the chapel was finally completed in 1803. With the new chapel completed, the members asked Rev Daniel Lewis to become their first minister.

From the outset of his ministry, Rev Lewis was determined to clear the chapel’s debt and thus travelled to London to raise money. On his return however, he presented the chapel with a list of his expenses incurred during his trip. Several of the members objected to the amount of the expenses and instigated an investigation by several ministers from other church. The investigation exonerated Rev Lewis, but those members who had instigated the investigation were unhappy the result and left to start their own cause, which eventually became Bethesda Chapel.

Within two years of this controversy, Rev Lewis decided to leave the chapel, and in 1810 Rev Samuel Evans (right) was ordained as minister, and it was under his ministry that the chapel began to prosper and eventually became one of the most important chapels in the area.

With Rev Evans’ influence the congregation grew rapidly, and in 1825 a new chapel was built at a cost £600. The membership increased steadily, but sadly Rev Samuel Evans died on 27 June 1833 at the age of 56.

For two years following Rev Evans’ death the chapel was without a minister as the members felt that it would be impossible to find someone qualified enough to fill the place of “twysog a’r gwr mawr oedd wedi syrthio” (the prince and great man who had fallen).

However, before the end of 1835, Rev Benjamin Owen (right) from Pembrokeshire was invited to become minister of the chapel. Rev Owen proved to be a worthy successor to Samuel Evans, and the chapel went from strength to strength.

By 1840 the congregation had once again grown considerably and it was decided to once again build a new chapel. Rev Owen was himself a gifted architect, and he designed the new building. The stonework was completed by Messrs Thomas Williams and David Richards, and the woodwork by John Gabe. The new chapel, one of the biggest in Wales, was completed in 1842 at a cost of £2300.

In 1849 Merthyr was hit by a devastating cholera epidemic in which 1,682 people died in Merthyr and Dowlais alone. In the aftermath of this, a religious revival occurred in the town and hundreds of people joined the congregation at Zoar, with 120 people actually being accepted into the church on one Sunday alone.

Due to the increase of numbers, in 1854 it was decided to build two schoolrooms at a cost of £800 – one in Caedraw and one in Pwllyrwhiad. In 1867 another large schoolroom was built in front of the chapel. Two houses were bought to make room for the building and the schoolroom was built at a cost of £550. In 1907, another large schoolroom was built at Queens Road at a cost of £750.

Zoar Schoolroom, Queen’s Road

By 2009, the membership of the chapel had dwindled to just six people, and it was reluctantly decided to close the chapel.

The chapel is now listed Grade II, as being of Special Architectural and Historic Interest.

The future of the chapel is ensured as it has been bought by Canolfan a Menter Gymraeg Merthyr Tudful and has been given a grant pledge of £527,000 from the Heritage Lottery Fund to transform the Chapel and Vestry buildings into a centre for performing arts and community activities. The project has also been supported with £300,000 from the Heads of the Valleys programme.

The new complex opened in 2011 and it is now a highly regarded and very important hub in the town.

The interior of Zoar Chapel just before it was converted into Canolfan Soar

3 thoughts on “Merthyr’s Chapels: Zoar Chapel”

  1. Where was the schoolroom in Caedraw? I went to Sunday School in a schoolroom, which was just called The Mission in the 1950s. I have no idea which chapel it was affiliated with, could it be this one?

    1. The ‘Mission’ in Caedraw was a part of Market Square Chapel. I’ve never been able to find out where Zoar’s Sunday School was in Caedraw

  2. I remember all the Christmas Concerts, Eisteddfod’s and Easter Services we attended from Abercanaid School to both Soar and Park Chapel. All arranged by Mrs Raymond the Junior School Teacher.

    Many good and happy times are remembered.

Comments are closed.