Merthyr’s Bridges: The Brandy Bridge – part 2

Within a matter of years of opening, people started remarking on the instability of the new ‘Brandy Bridge’. It was not uncommon for the bridge to ‘bounce’ if a horse and cart drove over it. In 1925 the driver of a road-roller reported serious movement in the bridge as he passed over it. When tested, it was noticed that each cross-girder twisted seriously as the roller drove across the bridge over a certain speed, but would then correct themselves after the roller had passed. After structural tests were performed, it was concluded that the cross-girders were too lightly constructed for the traffic using the bridge, and a two-ton maximum weight limit was imposed.

The Borough Council became increasingly worried about the situation. Of major concern was the fact that if a serious fire broke out in Abercanaid, the fire brigade would be unable to attend as the fire-engine weighed well in excess of two tons. The Borough Engineer examined the possibility of using one of the other bridges nearby – the ‘First Brandy Bridge’ or the old Llwyn-yr-Eos Bridge further down the river. Neither of these proved a viable solution due the cost and length of time it would take to make either bridge structurally sound enough to carry road traffic.

Again, bureaucracy between several parties intervened, and it wasn’t until 26 July 1929 that a start was finally made on a solution – constructing a ferro-concrete arch over the Taff, using the existing abutments, with reinforced concrete girders spanning the Great Western (formerly Taff Valley) Railway line, and the Plymouth Railway line being lowered to permit the line of the roadway to be maintained. The contract for the work was given to Lewis Harpur, grandson of Samuel Harpur who oversaw the construction of the original bridge. The repairs cost £4,430 and the bridge re-opened to traffic on 28 February 1934.

The ‘Second Brandy Bridge’ in 1934 following repairs. Photo courtesy of the Alan George Archive.

In December 1965, after exceptionally heavy rainfall, the River Taff turned into a torrent. The Plymouth Weir roughly 450 yards downstream, which had been disintegrating for some time, finally collapsed, releasing all the debris and silt which had been accumulating behind it. With the removal of this ‘barrier’ the flow of the river increased rapidly, undermining the foundations of the abutment on the west side of the bridge. The bottom of the abutment was ripped from its base, taking with it the bottom end of the arch, and consequently twisting the whole arch structure and breaking the roadway from the abutment. Below are some photos showing the damage.

Photos courtesy of the Alan George Archive

The bridge was rendered unusable. Within five days a temporary Bailey Bridge was installed by the army, which remained in operation until a new bridge was built.

The new bridge, the ‘Third Brandy Bridge’ was built down river from the old bridge. A reinforced concrete structure, it opened in December 1967, and is still in used today carrying traffic over the river and railway into Abercanaid.

The ‘Third Brandy Bridge’. Photo courtesy of the Alan George Archive

Of the two previous bridges there is no trace. The first bridge was dismantled during the 1960’s, and the second shortly after the new bridge opened.

That is the story of the ‘Brandy Bridge’…but not quite. One question remains – why is it called the ‘Brandy Bridge’?

The original bridge was informally called the cinder bridge, built to carry waste from Anthony Hill’s works to Abercanaid,and the story goes that the trams that were used to transport the waste over the bridge were horse-drawn. Apparently the horse in question was called ‘Brandy’, and it is said that the bridge was renamed in his honour. How true this story is remains unclear, but it would be nice to think that there was some truth in it, and that a simple, hard-working horse was remembered in this way.