Merthyr’s Bridges: The Brandy Bridge – part 2

Within a matter of years of opening, people started remarking on the instability of the new ‘Brandy Bridge’. It was not uncommon for the bridge to ‘bounce’ if a horse and cart drove over it. In 1925 the driver of a road-roller reported serious movement in the bridge as he passed over it. When tested, it was noticed that each cross-girder twisted seriously as the roller drove across the bridge over a certain speed, but would then correct themselves after the roller had passed. After structural tests were performed, it was concluded that the cross-girders were too lightly constructed for the traffic using the bridge, and a two-ton maximum weight limit was imposed.

The Borough Council became increasingly worried about the situation. Of major concern was the fact that if a serious fire broke out in Abercanaid, the fire brigade would be unable to attend as the fire-engine weighed well in excess of two tons. The Borough Engineer examined the possibility of using one of the other bridges nearby – the ‘First Brandy Bridge’ or the old Llwyn-yr-Eos Bridge further down the river. Neither of these proved a viable solution due the cost and length of time it would take to make either bridge structurally sound enough to carry road traffic.

Again, bureaucracy between several parties intervened, and it wasn’t until 26 July 1929 that a start was finally made on a solution – constructing a ferro-concrete arch over the Taff, using the existing abutments, with reinforced concrete girders spanning the Great Western (formerly Taff Valley) Railway line, and the Plymouth Railway line being lowered to permit the line of the roadway to be maintained. The contract for the work was given to Lewis Harpur, grandson of Samuel Harpur who oversaw the construction of the original bridge. The repairs cost £4,430 and the bridge re-opened to traffic on 28 February 1934.

The ‘Second Brandy Bridge’ in 1934 following repairs. Photo courtesy of the Alan George Archive.

In December 1965, after exceptionally heavy rainfall, the River Taff turned into a torrent. The Plymouth Weir roughly 450 yards downstream, which had been disintegrating for some time, finally collapsed, releasing all the debris and silt which had been accumulating behind it. With the removal of this ‘barrier’ the flow of the river increased rapidly, undermining the foundations of the abutment on the west side of the bridge. The bottom of the abutment was ripped from its base, taking with it the bottom end of the arch, and consequently twisting the whole arch structure and breaking the roadway from the abutment. Below are some photos showing the damage.

Photos courtesy of the Alan George Archive

The bridge was rendered unusable. Within five days a temporary Bailey Bridge was installed by the army, which remained in operation until a new bridge was built.

The new bridge, the ‘Third Brandy Bridge’ was built down river from the old bridge. A reinforced concrete structure, it opened in December 1967, and is still in used today carrying traffic over the river and railway into Abercanaid.

The ‘Third Brandy Bridge’. Photo courtesy of the Alan George Archive

Of the two previous bridges there is no trace. The first bridge was dismantled during the 1960’s, and the second shortly after the new bridge opened.

That is the story of the ‘Brandy Bridge’…but not quite. One question remains – why is it called the ‘Brandy Bridge’?

The original bridge was informally called the cinder bridge, built to carry waste from Anthony Hill’s works to Abercanaid,and the story goes that the trams that were used to transport the waste over the bridge were horse-drawn. Apparently the horse in question was called ‘Brandy’, and it is said that the bridge was renamed in his honour. How true this story is remains unclear, but it would be nice to think that there was some truth in it, and that a simple, hard-working horse was remembered in this way.

Merthyr’s Bridges: The Brandy Bridge – part 1

The ‘Brandy Bridge’ as it is commonly known, is actually, historically three separate bridges.

The ‘First Brandy Bridge’, commissioned by Anthony Hill, was built immediately below Brandy Bridge Junction in 1861, to carry the Plymouth Ironworks Tramway over the River Taff, Taff Vale Railway and Plymouth Railway. It was a square span in three sections; the main section was over the river and was about 80ft long, made up of two wrought iron plate-girders mounted on a masonry pier on the east side and a masonry abutment on the west.

The ‘First Brandy Bridge’ in the 1960s

After the closure of the Plymouth Ironworks in 1880, the bridge began to fall into disrepair, but was still used by pedestrians going to and from Abercanaid whilst a new bridge was being built 100 yards upstream.

Plans for the ‘Second Brandy Bridge’ had been discussed as early as 1857. In August of that year, a committee, consisting of among others Robert Thompson Crawshay, Anthony Hill & G T Clark was set up by the Local Board of Health to consider building a bridge across the Taff to Abercanaid, as up until then, the only pedestrian access to the village was via a ford called the Plymouth Crossing.

A section of the 1851 Ordnance Survey Map showing the Plymouth Crossing

By 1870 however, a bridge still hadn’t been built, much to the understandable exasperation of the population of Abercanaid. On 22 January 1870, the villagers held a public meeting where a proposition was made that “the first and surest way to obtain a bridge and a road to Abercanaid is by memorialising the Local Board of Health, and that this meeting has great confidence in the present Board that they will take prompt and active measures to obtain for us – a bridge”.

By 6 August the committee had investigated several sites but were all vetoed due to expense, until a site, at the old Plymouth Crossing was agreed upon. The total price for the new bridge was estimated to be between £400 and £500, and the committee approached the Taff Valley Railway Company for a contribution. The committee had not, however, prepared for the ensuing pettiness and inflexibility of the various landowners affected by the building of a new bridge and road.

It would be 10 years before the petty wrangling had been ironed out, and on 7 August 1880, the Local Board of Health, following an interview with the Taff Vale Railway Company, who were planning to expand their network, estimated that a new bridge would cost £1,600, with the railway company offering £600 towards the project. Further disagreements followed with the committee for the building of the bridge insisting that the Taff Valley Railway Company should pay a higher percentage of the cost.

The negotiations continued for two years until an agreement was finally reached, and it wasn’t until 1883 that work finally began on the bridge.

Samuel Harpur, Engineer and Surveyor of the Local Board of Health, was put in charge of the construction of the new bridge, and a contract was given to J Jones to deal with the excavation and stonework. The construction of the bridge itself was entrusted to The Cleveland Bridge and Engineering Company of Darlington who designed, built and erected the bridge which was 12 foot wide and made of steel lattice-work girders and steel cross-members. The bridge was opened late in 1883.

The ‘Second Brandy Bridge’. Photo courtesy of the Alan George Archive

To be continued…..